Ghana vs Sierra Leone: Time required to deal with construction permits
Ghana
218 days
in 2012
Sierra Leone
238 days
in 2012
Ghana rank
13th
Sierra Leone rank
12th
Time required to deal with construction permits over time
- Ghana
- Sierra Leone
How they compare
Sierra Leone currently reports 238 days against 218 days in Ghana, a difference of 20 days.
That makes Sierra Leone's figure about 1.1 times Ghana's.
Across all 8 years both countries report, Sierra Leone has been ahead every year.
Ghana ranks 13th and Sierra Leone ranks 12th of 50 countries.
Sierra Leone has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ghana | Sierra Leone | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 218 days | 248.6 days | 30.6 days | Sierra Leone |
| 2010s | 218 days | 238 days | 20 days | Sierra Leone |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Ghana or Sierra Leone?
- Sierra Leone, at 238 days against 218 days in Ghana as of 2012.
- What is the difference in time required to deal with construction permits between Ghana and Sierra Leone?
- 20 days, with Sierra Leone ahead.
- How many years of comparable data are there for Ghana and Sierra Leone?
- 8 years are reported by both, from 2005 to 2012.
- How do Ghana and Sierra Leone rank globally for time required to deal with construction permits?
- Ghana ranks 13th and Sierra Leone ranks 12th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.