Ghana vs Sudan: Time required to deal with construction permits
Ghana
218 days
in 2012
Sudan
270 days
in 2012
Ghana rank
13th
Sudan rank
10th
Time required to deal with construction permits over time
- Ghana
- Sudan
How they compare
Sudan currently reports 270 days against 218 days in Ghana, a difference of 52 days.
That makes Sudan's figure about 1.2 times Ghana's.
Across all 8 years both countries report, Sudan has been ahead every year.
Ghana ranks 13th and Sudan ranks 10th of 50 countries.
Sudan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ghana | Sudan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 218 days | 270 days | 52 days | Sudan |
| 2010s | 218 days | 270 days | 52 days | Sudan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Ghana or Sudan?
- Sudan, at 270 days against 218 days in Ghana as of 2012.
- What is the difference in time required to deal with construction permits between Ghana and Sudan?
- 52 days, with Sudan ahead.
- How many years of comparable data are there for Ghana and Sudan?
- 8 years are reported by both, from 2005 to 2012.
- How do Ghana and Sudan rank globally for time required to deal with construction permits?
- Ghana ranks 13th and Sudan ranks 10th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.