Guinea-Bissau vs Rwanda: Time required to deal with construction permits

Guinea-Bissau
163 days
in 2012
Rwanda
164 days
in 2012
Guinea-Bissau rank
27th
Rwanda rank
26th

Time required to deal with construction permits over time

  • Guinea-Bissau
  • Rwanda
0100200300200520082012

How they compare

Rwanda currently reports 164 days against 163 days in Guinea-Bissau, a difference of 1 days.

Across all 8 years both countries report, Rwanda has been ahead every year.

Guinea-Bissau ranks 27th and Rwanda ranks 26th of 50 countries.

Rwanda has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Guinea-Bissau Rwanda Difference Ahead
2000s 163 days 256.6 days 93.6 days Rwanda
2010s 163 days 164 days 1 days Rwanda

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Guinea-Bissau or Rwanda?
Rwanda, at 164 days against 163 days in Guinea-Bissau as of 2012.
What is the difference in time required to deal with construction permits between Guinea-Bissau and Rwanda?
1 days, with Rwanda ahead.
How many years of comparable data are there for Guinea-Bissau and Rwanda?
8 years are reported by both, from 2005 to 2012.
How do Guinea-Bissau and Rwanda rank globally for time required to deal with construction permits?
Guinea-Bissau ranks 27th and Rwanda ranks 26th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guinea-Bissau vs Rwanda: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/guinea-bissau/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/guinea-bissau/rwanda/">Guinea-Bissau vs Rwanda: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.