Guinea-Bissau vs Rwanda: Time required to deal with construction permits
Guinea-Bissau
163 days
in 2012
Rwanda
164 days
in 2012
Guinea-Bissau rank
27th
Rwanda rank
26th
Time required to deal with construction permits over time
- Guinea-Bissau
- Rwanda
How they compare
Rwanda currently reports 164 days against 163 days in Guinea-Bissau, a difference of 1 days.
Across all 8 years both countries report, Rwanda has been ahead every year.
Guinea-Bissau ranks 27th and Rwanda ranks 26th of 50 countries.
Rwanda has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Guinea-Bissau | Rwanda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 163 days | 256.6 days | 93.6 days | Rwanda |
| 2010s | 163 days | 164 days | 1 days | Rwanda |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Guinea-Bissau or Rwanda?
- Rwanda, at 164 days against 163 days in Guinea-Bissau as of 2012.
- What is the difference in time required to deal with construction permits between Guinea-Bissau and Rwanda?
- 1 days, with Rwanda ahead.
- How many years of comparable data are there for Guinea-Bissau and Rwanda?
- 8 years are reported by both, from 2005 to 2012.
- How do Guinea-Bissau and Rwanda rank globally for time required to deal with construction permits?
- Guinea-Bissau ranks 27th and Rwanda ranks 26th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.