Guinea vs Madagascar: Time required to deal with construction permits
Guinea
197 days
in 2012
Madagascar
172 days
in 2012
Guinea rank
20th
Madagascar rank
23rd
Time required to deal with construction permits over time
- Guinea
- Madagascar
How they compare
Guinea currently reports 197 days against 172 days in Madagascar, a difference of 25 days.
That makes Guinea's figure about 1.1 times Madagascar's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Madagascar ahead.
Guinea ranks 20th and Madagascar ranks 23rd of 50 countries.
Across the 2 decades both report, Guinea averaged higher in 1 and Madagascar in 1.
Head to head by decade
| Decade | Guinea | Madagascar | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 197 days | 242.2 days | 45.2 days | Madagascar |
| 2010s | 197 days | 172 days | 25 days | Guinea |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Guinea or Madagascar?
- Guinea, at 197 days against 172 days in Madagascar as of 2012.
- What is the difference in time required to deal with construction permits between Guinea and Madagascar?
- 25 days, with Guinea ahead.
- How many years of comparable data are there for Guinea and Madagascar?
- 8 years are reported by both, from 2005 to 2012.
- How do Guinea and Madagascar rank globally for time required to deal with construction permits?
- Guinea ranks 20th and Madagascar ranks 23rd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.