Guinea vs Malawi: Time required to deal with construction permits
Guinea
197 days
in 2012
Malawi
200 days
in 2012
Guinea rank
20th
Malawi rank
19th
Time required to deal with construction permits over time
- Guinea
- Malawi
How they compare
Malawi currently reports 200 days against 197 days in Guinea, a difference of 3 days.
Across all 8 years both countries report, Malawi has been ahead every year.
Guinea ranks 20th and Malawi ranks 19th of 50 countries.
Malawi has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Guinea | Malawi | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 197 days | 200 days | 3 days | Malawi |
| 2010s | 197 days | 200 days | 3 days | Malawi |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Guinea or Malawi?
- Malawi, at 200 days against 197 days in Guinea as of 2012.
- What is the difference in time required to deal with construction permits between Guinea and Malawi?
- 3 days, with Malawi ahead.
- How many years of comparable data are there for Guinea and Malawi?
- 8 years are reported by both, from 2005 to 2012.
- How do Guinea and Malawi rank globally for time required to deal with construction permits?
- Guinea ranks 20th and Malawi ranks 19th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.