Guinea vs Mali: Time required to deal with construction permits

Guinea
197 days
in 2012
Mali
179 days
in 2012
Guinea rank
20th
Mali rank
22nd

Time required to deal with construction permits over time

  • Guinea
  • Mali
0100200300200520082012

How they compare

Guinea currently reports 197 days against 179 days in Mali, a difference of 18 days.

That makes Guinea's figure about 1.1 times Mali's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mali ahead.

Guinea ranks 20th and Mali ranks 22nd of 50 countries.

Across the 2 decades both report, Guinea averaged higher in 1 and Mali in 1.

Head to head by decade

Decade Guinea Mali Difference Ahead
2000s 197 days 239.8 days 42.8 days Mali
2010s 197 days 181.67 days 15.33 days Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Guinea or Mali?
Guinea, at 197 days against 179 days in Mali as of 2012.
What is the difference in time required to deal with construction permits between Guinea and Mali?
18 days, with Guinea ahead.
How many years of comparable data are there for Guinea and Mali?
8 years are reported by both, from 2005 to 2012.
How do Guinea and Mali rank globally for time required to deal with construction permits?
Guinea ranks 20th and Mali ranks 22nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guinea vs Mali: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/guinea/mali/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/guinea/mali/">Guinea vs Mali: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.