Time required to deal with construction permits in Mali

Mali: Time required to deal with construction permits was 179 days in 2012. ▼ Falling

Latest (2012)
179 days
Change on year
unchanged
World rank
22nd
of 50 countries
All-time high
280 days
in 2005
All-time low
179 days
in 2011
Years of data
8
2005–2012

Time required to deal with construction permits in Mali, 2005–2012

01002003002005200820122005: 280 days2006: 238 days2007: 238 days2008: 238 days2009: 205 days2010: 187 days2011: 179 days2012: 179 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Mali stood at 179 days. That is the lowest value across all 8 years on record.

The figure is down 36.1% over ten years.

That places Mali 22nd out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 239.8 days 205 days 280 days 5
2010s 181.67 days 179 days 187 days 3

Countries ranked near Mali

  1. 19 Malawi 200 days compare
  2. 20 Guinea 197 days compare
  3. 21 Zambia 196 days compare
  4. 23 Djibouti 172 days compare
  5. 23 Madagascar 172 days compare
  6. 25 Equatorial Guinea 166 days compare

See the full ranking of 56 places →

More private sector data for Mali

All data for Mali →

Frequently asked questions

What is time required to deal with construction permits in Mali?
Time required to deal with construction permits in Mali was 179 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Mali?
The highest recorded value was 280 days in 2005.
What is the lowest time required to deal with construction permits recorded in Mali?
The lowest recorded value was 179 days in 2011.
How does Mali rank for time required to deal with construction permits?
Mali ranks 22nd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Mali?
Over the last ten years it is down 36.1%. The long-run trend across the full record is falling.
Where does this Mali data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.