Time required to deal with construction permits in Mali
Mali: Time required to deal with construction permits was 179 days in 2012. ▼ Falling
Time required to deal with construction permits in Mali, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
In 2012, time required to deal with construction permits in Mali stood at 179 days. That is the lowest value across all 8 years on record.
The figure is down 36.1% over ten years.
That places Mali 22nd out of 50 countries with data for 2012, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 239.8 days | 205 days | 280 days | 5 |
| 2010s | 181.67 days | 179 days | 187 days | 3 |
Countries ranked near Mali
More private sector data for Mali
- Merchandise trade 39.3% (2025)
- Food imports 13.5% (2023)
- Manufactures imports 49.3% (2023)
- Merchandise imports 6.98 billion current US$ (2025)
- Food exports 6.2% (2023)
- Manufactures exports 6.5% (2023)
- Merchandise exports 4.86 billion current US$ (2025)
- Commercial service exports 436.55 million current US$ (2024)
- Transport services 68.7% (2024)
- Computer, communications and other services 19.1% (2024)
Frequently asked questions
- What is time required to deal with construction permits in Mali?
- Time required to deal with construction permits in Mali was 179 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Mali?
- The highest recorded value was 280 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Mali?
- The lowest recorded value was 179 days in 2011.
- How does Mali rank for time required to deal with construction permits?
- Mali ranks 22nd out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Mali?
- Over the last ten years it is down 36.1%. The long-run trend across the full record is falling.
- Where does this Mali data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.