Kenya vs Seychelles: Time required to deal with construction permits

Kenya
125 days
in 2012
Seychelles
126 days
in 2012
Kenya rank
38th
Seychelles rank
37th

Time required to deal with construction permits over time

  • Kenya
  • Seychelles
050100150200520082012

How they compare

Seychelles currently reports 126 days against 125 days in Kenya, a difference of 1 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Kenya ahead.

Kenya ranks 38th and Seychelles ranks 37th of 50 countries.

Across the 2 decades both report, Kenya averaged higher in 1 and Seychelles in 1.

Head to head by decade

Decade Kenya Seychelles Difference Ahead
2000s 137.2 days 126 days 11.2 days Kenya
2010s 125 days 126.33 days 1.33 days Seychelles

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Kenya or Seychelles?
Seychelles, at 126 days against 125 days in Kenya as of 2012.
What is the difference in time required to deal with construction permits between Kenya and Seychelles?
1 days, with Seychelles ahead.
How many years of comparable data are there for Kenya and Seychelles?
8 years are reported by both, from 2005 to 2012.
How do Kenya and Seychelles rank globally for time required to deal with construction permits?
Kenya ranks 38th and Seychelles ranks 37th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kenya vs Seychelles: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/kenya/seychelles/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/kenya/seychelles/">Kenya vs Seychelles: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.