Kenya vs Seychelles: Time required to deal with construction permits
Kenya
125 days
in 2012
Seychelles
126 days
in 2012
Kenya rank
38th
Seychelles rank
37th
Time required to deal with construction permits over time
- Kenya
- Seychelles
How they compare
Seychelles currently reports 126 days against 125 days in Kenya, a difference of 1 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Kenya ahead.
Kenya ranks 38th and Seychelles ranks 37th of 50 countries.
Across the 2 decades both report, Kenya averaged higher in 1 and Seychelles in 1.
Head to head by decade
| Decade | Kenya | Seychelles | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 137.2 days | 126 days | 11.2 days | Kenya |
| 2010s | 125 days | 126.33 days | 1.33 days | Seychelles |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Kenya or Seychelles?
- Seychelles, at 126 days against 125 days in Kenya as of 2012.
- What is the difference in time required to deal with construction permits between Kenya and Seychelles?
- 1 days, with Seychelles ahead.
- How many years of comparable data are there for Kenya and Seychelles?
- 8 years are reported by both, from 2005 to 2012.
- How do Kenya and Seychelles rank globally for time required to deal with construction permits?
- Kenya ranks 38th and Seychelles ranks 37th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.