Lesotho vs Mozambique: Time required to deal with construction permits

Lesotho
330 days
in 2012
Mozambique
377 days
in 2012
Lesotho rank
5th
Mozambique rank
3rd

Time required to deal with construction permits over time

  • Lesotho
  • Mozambique
0100200300400200520082012

How they compare

Mozambique currently reports 377 days against 330 days in Lesotho, a difference of 47 days.

That makes Mozambique's figure about 1.1 times Lesotho's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Lesotho ahead.

Lesotho ranks 5th and Mozambique ranks 3rd of 50 countries.

Across the 2 decades both report, Lesotho averaged higher in 1 and Mozambique in 1.

Head to head by decade

Decade Lesotho Mozambique Difference Ahead
2000s 401.2 days 377 days 24.2 days Lesotho
2010s 330 days 377 days 47 days Mozambique

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Lesotho or Mozambique?
Mozambique, at 377 days against 330 days in Lesotho as of 2012.
What is the difference in time required to deal with construction permits between Lesotho and Mozambique?
47 days, with Mozambique ahead.
How many years of comparable data are there for Lesotho and Mozambique?
8 years are reported by both, from 2005 to 2012.
How do Lesotho and Mozambique rank globally for time required to deal with construction permits?
Lesotho ranks 5th and Mozambique ranks 3rd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lesotho vs Mozambique: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/lesotho/mozambique/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/lesotho/mozambique/">Lesotho vs Mozambique: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.