Lesotho vs Togo: Time required to deal with construction permits
Lesotho
330 days
in 2012
Togo
309 days
in 2012
Lesotho rank
5th
Togo rank
7th
Time required to deal with construction permits over time
- Lesotho
- Togo
How they compare
Lesotho currently reports 330 days against 309 days in Togo, a difference of 21 days.
That makes Lesotho's figure about 1.1 times Togo's.
Across all 8 years both countries report, Lesotho has been ahead every year.
Lesotho ranks 5th and Togo ranks 7th of 50 countries.
Lesotho has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Lesotho | Togo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 401.2 days | 309 days | 92.2 days | Lesotho |
| 2010s | 330 days | 309 days | 21 days | Lesotho |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Lesotho or Togo?
- Lesotho, at 330 days against 309 days in Togo as of 2012.
- What is the difference in time required to deal with construction permits between Lesotho and Togo?
- 21 days, with Lesotho ahead.
- How many years of comparable data are there for Lesotho and Togo?
- 8 years are reported by both, from 2005 to 2012.
- How do Lesotho and Togo rank globally for time required to deal with construction permits?
- Lesotho ranks 5th and Togo ranks 7th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.