Liberia vs Mauritania: Time required to deal with construction permits
Liberia
75 days
in 2012
Mauritania
82 days
in 2012
Liberia rank
50th
Mauritania rank
49th
Time required to deal with construction permits over time
- Liberia
- Mauritania
How they compare
Mauritania currently reports 82 days against 75 days in Liberia, a difference of 7 days.
That makes Mauritania's figure about 1.1 times Liberia's.
The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.
Liberia ranks 50th and Mauritania ranks 49th of 50 countries.
Across the 2 decades both report, Liberia averaged higher in 1 and Mauritania in 1.
Head to head by decade
| Decade | Liberia | Mauritania | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 317.5 days | 162 days | 155.5 days | Liberia |
| 2010s | 75 days | 98.33 days | 23.33 days | Mauritania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Liberia or Mauritania?
- Mauritania, at 82 days against 75 days in Liberia as of 2012.
- What is the difference in time required to deal with construction permits between Liberia and Mauritania?
- 7 days, with Mauritania ahead.
- How many years of comparable data are there for Liberia and Mauritania?
- 7 years are reported by both, from 2006 to 2012.
- How do Liberia and Mauritania rank globally for time required to deal with construction permits?
- Liberia ranks 50th and Mauritania ranks 49th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.