Time required to deal with construction permits in Liberia

Liberia: Time required to deal with construction permits was 75 days in 2012. ◆ Volatile

Latest (2012)
75 days
Change on year
unchanged
World rank
50th
of 50 countries
All-time high
424 days
in 2006
All-time low
75 days
in 2009
Years of data
7
2006–2012

Time required to deal with construction permits in Liberia, 2006–2012

1002003004002006200920122006: 424 days2007: 424 days2008: 347 days2009: 75 days2010: 75 days2011: 75 days2012: 75 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Liberia recorded 75 days for time required to deal with construction permits in 2012. That is the lowest value across all 7 years on record.

Compared with earlier readings it is down 82.3% over ten years.

That places Liberia 50th out of 50 countries with data for 2012, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 317.5 days 75 days 424 days 4
2010s 75 days 75 days 75 days 3

Countries ranked near Liberia

  1. 47 Tunisia 88 days compare
  2. 48 Nigeria 85 days compare
  3. 49 Mauritania 82 days compare

See the full ranking of 56 places →

More private sector data for Liberia

All data for Liberia →

Frequently asked questions

What is time required to deal with construction permits in Liberia?
Time required to deal with construction permits in Liberia was 75 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Liberia?
The highest recorded value was 424 days in 2006.
What is the lowest time required to deal with construction permits recorded in Liberia?
The lowest recorded value was 75 days in 2009.
How does Liberia rank for time required to deal with construction permits?
Liberia ranks 50th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Liberia?
Over the last ten years it is down 82.3%. The long-run trend across the full record is volatile.
Where does this Liberia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 7 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.