Liberia vs Nigeria: Time required to deal with construction permits
Liberia
75 days
in 2012
Nigeria
85 days
in 2012
Liberia rank
50th
Nigeria rank
48th
Time required to deal with construction permits over time
- Liberia
- Nigeria
How they compare
Nigeria currently reports 85 days against 75 days in Liberia, a difference of 10 days.
That makes Nigeria's figure about 1.1 times Liberia's.
The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.
Liberia ranks 50th and Nigeria ranks 48th of 50 countries.
Across the 2 decades both report, Liberia averaged higher in 1 and Nigeria in 1.
Head to head by decade
| Decade | Liberia | Nigeria | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 317.5 days | 264 days | 53.5 days | Liberia |
| 2010s | 75 days | 85 days | 10 days | Nigeria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Liberia or Nigeria?
- Nigeria, at 85 days against 75 days in Liberia as of 2012.
- What is the difference in time required to deal with construction permits between Liberia and Nigeria?
- 10 days, with Nigeria ahead.
- How many years of comparable data are there for Liberia and Nigeria?
- 7 years are reported by both, from 2006 to 2012.
- How do Liberia and Nigeria rank globally for time required to deal with construction permits?
- Liberia ranks 50th and Nigeria ranks 48th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.