Time required to deal with construction permits in Nigeria

Nigeria: Time required to deal with construction permits was 85 days in 2012. ▼ Falling

Latest (2012)
85 days
Change on year
unchanged
World rank
48th
of 50 countries
All-time high
303 days
in 2005
All-time low
85 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Nigeria, 2005–2012

1001502002503002005200820122005: 303 days2006: 303 days2007: 251 days2008: 251 days2009: 251 days2010: 85 days2011: 85 days2012: 85 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Nigeria recorded 85 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

The figure is down 71.9% over ten years.

Nigeria ranks 48th of 50 countries on this measure, in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 271.8 days 251 days 303 days 5
2010s 85 days 85 days 85 days 3

Countries ranked near Nigeria

  1. 45 Morocco 97 days compare
  2. 46 Eswatini 95 days compare
  3. 47 Tunisia 88 days compare
  4. 49 Mauritania 82 days compare
  5. 50 Liberia 75 days compare

See the full ranking of 56 places →

More private sector data for Nigeria

All data for Nigeria →

Frequently asked questions

What is time required to deal with construction permits in Nigeria?
Time required to deal with construction permits in Nigeria was 85 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Nigeria?
The highest recorded value was 303 days in 2005.
What is the lowest time required to deal with construction permits recorded in Nigeria?
The lowest recorded value was 85 days in 2010.
How does Nigeria rank for time required to deal with construction permits?
Nigeria ranks 48th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Nigeria?
Over the last ten years it is down 71.9%. The long-run trend across the full record is falling.
Where does this Nigeria data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.