Liberia vs Tunisia: Time required to deal with construction permits

Liberia
75 days
in 2012
Tunisia
88 days
in 2012
Liberia rank
50th
Tunisia rank
47th

Time required to deal with construction permits over time

  • Liberia
  • Tunisia
100200300400200520082012

How they compare

Tunisia currently reports 88 days against 75 days in Liberia, a difference of 13 days.

That makes Tunisia's figure about 1.2 times Liberia's.

The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.

Liberia ranks 50th and Tunisia ranks 47th of 50 countries.

Across the 2 decades both report, Liberia averaged higher in 1 and Tunisia in 1.

Head to head by decade

Decade Liberia Tunisia Difference Ahead
2000s 317.5 days 85.5 days 232 days Liberia
2010s 75 days 88 days 13 days Tunisia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Liberia or Tunisia?
Tunisia, at 88 days against 75 days in Liberia as of 2012.
What is the difference in time required to deal with construction permits between Liberia and Tunisia?
13 days, with Tunisia ahead.
How many years of comparable data are there for Liberia and Tunisia?
7 years are reported by both, from 2006 to 2012.
How do Liberia and Tunisia rank globally for time required to deal with construction permits?
Liberia ranks 50th and Tunisia ranks 47th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Liberia vs Tunisia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/liberia/tunisia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/liberia/tunisia/">Liberia vs Tunisia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.