Liberia vs Tunisia: Time required to deal with construction permits
Liberia
75 days
in 2012
Tunisia
88 days
in 2012
Liberia rank
50th
Tunisia rank
47th
Time required to deal with construction permits over time
- Liberia
- Tunisia
How they compare
Tunisia currently reports 88 days against 75 days in Liberia, a difference of 13 days.
That makes Tunisia's figure about 1.2 times Liberia's.
The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.
Liberia ranks 50th and Tunisia ranks 47th of 50 countries.
Across the 2 decades both report, Liberia averaged higher in 1 and Tunisia in 1.
Head to head by decade
| Decade | Liberia | Tunisia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 317.5 days | 85.5 days | 232 days | Liberia |
| 2010s | 75 days | 88 days | 13 days | Tunisia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Liberia or Tunisia?
- Tunisia, at 88 days against 75 days in Liberia as of 2012.
- What is the difference in time required to deal with construction permits between Liberia and Tunisia?
- 13 days, with Tunisia ahead.
- How many years of comparable data are there for Liberia and Tunisia?
- 7 years are reported by both, from 2006 to 2012.
- How do Liberia and Tunisia rank globally for time required to deal with construction permits?
- Liberia ranks 50th and Tunisia ranks 47th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.