Madagascar vs Mali: Time required to deal with construction permits
Madagascar
172 days
in 2012
Mali
179 days
in 2012
Madagascar rank
23rd
Mali rank
22nd
Time required to deal with construction permits over time
- Madagascar
- Mali
How they compare
Mali currently reports 179 days against 172 days in Madagascar, a difference of 7 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Madagascar ahead.
Madagascar ranks 23rd and Mali ranks 22nd of 50 countries.
Across the 2 decades both report, Madagascar averaged higher in 1 and Mali in 1.
Head to head by decade
| Decade | Madagascar | Mali | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 242.2 days | 239.8 days | 2.4 days | Madagascar |
| 2010s | 172 days | 181.67 days | 9.67 days | Mali |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Madagascar or Mali?
- Mali, at 179 days against 172 days in Madagascar as of 2012.
- What is the difference in time required to deal with construction permits between Madagascar and Mali?
- 7 days, with Mali ahead.
- How many years of comparable data are there for Madagascar and Mali?
- 8 years are reported by both, from 2005 to 2012.
- How do Madagascar and Mali rank globally for time required to deal with construction permits?
- Madagascar ranks 23rd and Mali ranks 22nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.