Madagascar vs Mali: Time required to deal with construction permits

Madagascar
172 days
in 2012
Mali
179 days
in 2012
Madagascar rank
23rd
Mali rank
22nd

Time required to deal with construction permits over time

  • Madagascar
  • Mali
0100200300200520082012

How they compare

Mali currently reports 179 days against 172 days in Madagascar, a difference of 7 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Madagascar ahead.

Madagascar ranks 23rd and Mali ranks 22nd of 50 countries.

Across the 2 decades both report, Madagascar averaged higher in 1 and Mali in 1.

Head to head by decade

Decade Madagascar Mali Difference Ahead
2000s 242.2 days 239.8 days 2.4 days Madagascar
2010s 172 days 181.67 days 9.67 days Mali

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Madagascar or Mali?
Mali, at 179 days against 172 days in Madagascar as of 2012.
What is the difference in time required to deal with construction permits between Madagascar and Mali?
7 days, with Mali ahead.
How many years of comparable data are there for Madagascar and Mali?
8 years are reported by both, from 2005 to 2012.
How do Madagascar and Mali rank globally for time required to deal with construction permits?
Madagascar ranks 23rd and Mali ranks 22nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Madagascar vs Mali: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/madagascar/mali/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/madagascar/mali/">Madagascar vs Mali: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.