Madagascar vs Rwanda: Time required to deal with construction permits

Madagascar
172 days
in 2012
Rwanda
164 days
in 2012
Madagascar rank
23rd
Rwanda rank
26th

Time required to deal with construction permits over time

  • Madagascar
  • Rwanda
0100200300200520082012

How they compare

Madagascar currently reports 172 days against 164 days in Rwanda, a difference of 8 days.

The two have swapped places 3 times across 8 shared years of data; in 2005 it was Rwanda ahead.

Madagascar ranks 23rd and Rwanda ranks 26th of 50 countries.

Across the 2 decades both report, Madagascar averaged higher in 1 and Rwanda in 1.

Head to head by decade

Decade Madagascar Rwanda Difference Ahead
2000s 242.2 days 256.6 days 14.4 days Rwanda
2010s 172 days 164 days 8 days Madagascar

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Madagascar or Rwanda?
Madagascar, at 172 days against 164 days in Rwanda as of 2012.
What is the difference in time required to deal with construction permits between Madagascar and Rwanda?
8 days, with Madagascar ahead.
How many years of comparable data are there for Madagascar and Rwanda?
8 years are reported by both, from 2005 to 2012.
How do Madagascar and Rwanda rank globally for time required to deal with construction permits?
Madagascar ranks 23rd and Rwanda ranks 26th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.