Madagascar vs Zambia: Time required to deal with construction permits
Madagascar
172 days
in 2012
Zambia
196 days
in 2012
Madagascar rank
23rd
Zambia rank
21st
Time required to deal with construction permits over time
- Madagascar
- Zambia
How they compare
Zambia currently reports 196 days against 172 days in Madagascar, a difference of 24 days.
That makes Zambia's figure about 1.1 times Madagascar's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Madagascar ahead.
Madagascar ranks 23rd and Zambia ranks 21st of 50 countries.
Across the 2 decades both report, Madagascar averaged higher in 1 and Zambia in 1.
Head to head by decade
| Decade | Madagascar | Zambia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 242.2 days | 207.6 days | 34.6 days | Madagascar |
| 2010s | 172 days | 196 days | 24 days | Zambia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Madagascar or Zambia?
- Zambia, at 196 days against 172 days in Madagascar as of 2012.
- What is the difference in time required to deal with construction permits between Madagascar and Zambia?
- 24 days, with Zambia ahead.
- How many years of comparable data are there for Madagascar and Zambia?
- 8 years are reported by both, from 2005 to 2012.
- How do Madagascar and Zambia rank globally for time required to deal with construction permits?
- Madagascar ranks 23rd and Zambia ranks 21st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.