Malawi vs Mali: Time required to deal with construction permits
Malawi
200 days
in 2012
Mali
179 days
in 2012
Malawi rank
19th
Mali rank
22nd
Time required to deal with construction permits over time
- Malawi
- Mali
How they compare
Malawi currently reports 200 days against 179 days in Mali, a difference of 21 days.
That makes Malawi's figure about 1.1 times Mali's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mali ahead.
Malawi ranks 19th and Mali ranks 22nd of 50 countries.
Across the 2 decades both report, Malawi averaged higher in 1 and Mali in 1.
Head to head by decade
| Decade | Malawi | Mali | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 200 days | 239.8 days | 39.8 days | Mali |
| 2010s | 200 days | 181.67 days | 18.33 days | Malawi |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Malawi or Mali?
- Malawi, at 200 days against 179 days in Mali as of 2012.
- What is the difference in time required to deal with construction permits between Malawi and Mali?
- 21 days, with Malawi ahead.
- How many years of comparable data are there for Malawi and Mali?
- 8 years are reported by both, from 2005 to 2012.
- How do Malawi and Mali rank globally for time required to deal with construction permits?
- Malawi ranks 19th and Mali ranks 22nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.