Malawi vs Tanzania: Time required to deal with construction permits (days)
Malawi
200 days
in 2012
Tanzania
206 days
in 2012
Malawi rank
19th
Tanzania rank
16th
Time required to deal with construction permits (days) over time
- Malawi
- Tanzania
How they compare
Tanzania currently reports 206 days against 200 days in Malawi, a difference of 6 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Malawi ahead.
Malawi ranks 19th and Tanzania ranks 16th of 50 countries.
Across the 2 decades both report, Malawi averaged higher in 1 and Tanzania in 1.
Head to head by decade
| Decade | Malawi | Tanzania | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 200 days | 190 days | 10 days | Malawi |
| 2010s | 200 days | 206 days | 6 days | Tanzania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Malawi or Tanzania?
- Tanzania, at 206 days against 200 days in Malawi as of 2012.
- What is the difference in time required to deal with construction permits between Malawi and Tanzania?
- 6 days, with Tanzania ahead.
- How many years of comparable data are there for Malawi and Tanzania?
- 8 years are reported by both, from 2005 to 2012.
- How do Malawi and Tanzania rank globally for time required to deal with construction permits?
- Malawi ranks 19th and Tanzania ranks 16th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.