Mali vs Zambia: Time required to deal with construction permits

Mali
179 days
in 2012
Zambia
196 days
in 2012
Mali rank
22nd
Zambia rank
21st

Time required to deal with construction permits over time

  • Mali
  • Zambia
0100200300200520082012

How they compare

Zambia currently reports 196 days against 179 days in Mali, a difference of 17 days.

That makes Zambia's figure about 1.1 times Mali's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mali ahead.

Mali ranks 22nd and Zambia ranks 21st of 50 countries.

Across the 2 decades both report, Mali averaged higher in 1 and Zambia in 1.

Head to head by decade

Decade Mali Zambia Difference Ahead
2000s 239.8 days 207.6 days 32.2 days Mali
2010s 181.67 days 196 days 14.33 days Zambia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Mali or Zambia?
Zambia, at 196 days against 179 days in Mali as of 2012.
What is the difference in time required to deal with construction permits between Mali and Zambia?
17 days, with Zambia ahead.
How many years of comparable data are there for Mali and Zambia?
8 years are reported by both, from 2005 to 2012.
How do Mali and Zambia rank globally for time required to deal with construction permits?
Mali ranks 22nd and Zambia ranks 21st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mali vs Zambia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mali/zambia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mali/zambia/">Mali vs Zambia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.