Mauritania vs Tunisia: Time required to deal with construction permits
Mauritania
82 days
in 2012
Tunisia
88 days
in 2012
Mauritania rank
49th
Tunisia rank
47th
Time required to deal with construction permits over time
- Mauritania
- Tunisia
How they compare
Tunisia currently reports 88 days against 82 days in Mauritania, a difference of 6 days.
That makes Tunisia's figure about 1.1 times Mauritania's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mauritania ahead.
Mauritania ranks 49th and Tunisia ranks 47th of 50 countries.
Mauritania has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Mauritania | Tunisia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 162 days | 86.4 days | 75.6 days | Mauritania |
| 2010s | 98.33 days | 88 days | 10.33 days | Mauritania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Mauritania or Tunisia?
- Tunisia, at 88 days against 82 days in Mauritania as of 2012.
- What is the difference in time required to deal with construction permits between Mauritania and Tunisia?
- 6 days, with Tunisia ahead.
- How many years of comparable data are there for Mauritania and Tunisia?
- 8 years are reported by both, from 2005 to 2012.
- How do Mauritania and Tunisia rank globally for time required to deal with construction permits?
- Mauritania ranks 49th and Tunisia ranks 47th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.