Morocco vs Nigeria: Time required to deal with construction permits

Morocco
97 days
in 2012
Nigeria
85 days
in 2012
Morocco rank
45th
Nigeria rank
48th

Time required to deal with construction permits over time

  • Morocco
  • Nigeria
100150200250300200520082012

How they compare

Morocco currently reports 97 days against 85 days in Nigeria, a difference of 12 days.

That makes Morocco's figure about 1.1 times Nigeria's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Nigeria ahead.

Morocco ranks 45th and Nigeria ranks 48th of 50 countries.

Across the 2 decades both report, Morocco averaged higher in 1 and Nigeria in 1.

Head to head by decade

Decade Morocco Nigeria Difference Ahead
2000s 108 days 271.8 days 163.8 days Nigeria
2010s 99.33 days 85 days 14.33 days Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Morocco or Nigeria?
Morocco, at 97 days against 85 days in Nigeria as of 2012.
What is the difference in time required to deal with construction permits between Morocco and Nigeria?
12 days, with Morocco ahead.
How many years of comparable data are there for Morocco and Nigeria?
8 years are reported by both, from 2005 to 2012.
How do Morocco and Nigeria rank globally for time required to deal with construction permits?
Morocco ranks 45th and Nigeria ranks 48th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Morocco vs Nigeria: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/morocco/nigeria/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/morocco/nigeria/">Morocco vs Nigeria: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.