Morocco vs Nigeria: Time required to deal with construction permits
Morocco
97 days
in 2012
Nigeria
85 days
in 2012
Morocco rank
45th
Nigeria rank
48th
Time required to deal with construction permits over time
- Morocco
- Nigeria
How they compare
Morocco currently reports 97 days against 85 days in Nigeria, a difference of 12 days.
That makes Morocco's figure about 1.1 times Nigeria's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Nigeria ahead.
Morocco ranks 45th and Nigeria ranks 48th of 50 countries.
Across the 2 decades both report, Morocco averaged higher in 1 and Nigeria in 1.
Head to head by decade
| Decade | Morocco | Nigeria | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 108 days | 271.8 days | 163.8 days | Nigeria |
| 2010s | 99.33 days | 85 days | 14.33 days | Morocco |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Morocco or Nigeria?
- Morocco, at 97 days against 85 days in Nigeria as of 2012.
- What is the difference in time required to deal with construction permits between Morocco and Nigeria?
- 12 days, with Morocco ahead.
- How many years of comparable data are there for Morocco and Nigeria?
- 8 years are reported by both, from 2005 to 2012.
- How do Morocco and Nigeria rank globally for time required to deal with construction permits?
- Morocco ranks 45th and Nigeria ranks 48th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.