Mozambique, Republic of vs Niger: Time required to deal with construction permits

Mozambique, Republic of
377 days
in 2012
Niger
326 days
in 2012
Mozambique, Republic of rank
3rd
Niger rank
6th

Time required to deal with construction permits over time

  • Mozambique, Republic of
  • Niger
0100200300400200520082012

How they compare

Mozambique, Republic of currently reports 377 days against 326 days in Niger, a difference of 51 days.

That makes Mozambique, Republic of's figure about 1.2 times Niger's.

Across all 8 years both countries report, Mozambique, Republic of has been ahead every year.

Mozambique, Republic of ranks 3rd and Niger ranks 6th of 50 countries.

Mozambique, Republic of has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mozambique, Republic of Niger Difference Ahead
2000s 377 days 327.8 days 49.2 days Mozambique, Republic of
2010s 377 days 326 days 51 days Mozambique, Republic of

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Mozambique, Republic of or Niger?
Mozambique, Republic of, at 377 days against 326 days in Niger as of 2012.
What is the difference in time required to deal with construction permits between Mozambique, Republic of and Niger?
51 days, with Mozambique, Republic of ahead.
How many years of comparable data are there for Mozambique, Republic of and Niger?
8 years are reported by both, from 2005 to 2012.
How do Mozambique, Republic of and Niger rank globally for time required to deal with construction permits?
Mozambique, Republic of ranks 3rd and Niger ranks 6th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mozambique, Republic of vs Niger: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mozambique/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mozambique/niger/">Mozambique, Republic of vs Niger: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.