Mozambique vs Zimbabwe: Time required to deal with construction permits

Mozambique
377 days
in 2012
Zimbabwe
614 days
in 2012
Mozambique rank
3rd
Zimbabwe rank
1st

Time required to deal with construction permits over time

  • Mozambique
  • Zimbabwe
0200400600200520082012

How they compare

Zimbabwe currently reports 614 days against 377 days in Mozambique, a difference of 237 days.

That makes Zimbabwe's figure about 1.6 times Mozambique's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mozambique ahead.

Mozambique ranks 3rd and Zimbabwe ranks 1st of 50 countries.

Zimbabwe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mozambique Zimbabwe Difference Ahead
2000s 377 days 482.8 days 105.8 days Zimbabwe
2010s 377 days 614 days 237 days Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Mozambique or Zimbabwe?
Zimbabwe, at 614 days against 377 days in Mozambique as of 2012.
What is the difference in time required to deal with construction permits between Mozambique and Zimbabwe?
237 days, with Zimbabwe ahead.
How many years of comparable data are there for Mozambique and Zimbabwe?
8 years are reported by both, from 2005 to 2012.
How do Mozambique and Zimbabwe rank globally for time required to deal with construction permits?
Mozambique ranks 3rd and Zimbabwe ranks 1st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mozambique vs Zimbabwe: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mozambique/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/mozambique/zimbabwe/">Mozambique vs Zimbabwe: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.