Namibia vs Seychelles: Time required to deal with construction permits
Namibia
139 days
in 2012
Seychelles
126 days
in 2012
Namibia rank
34th
Seychelles rank
37th
Time required to deal with construction permits over time
- Namibia
- Seychelles
How they compare
Namibia currently reports 139 days against 126 days in Seychelles, a difference of 13 days.
That makes Namibia's figure about 1.1 times Seychelles's.
Across all 8 years both countries report, Namibia has been ahead every year.
Namibia ranks 34th and Seychelles ranks 37th of 50 countries.
Namibia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Namibia | Seychelles | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 143.8 days | 126 days | 17.8 days | Namibia |
| 2010s | 139 days | 126.33 days | 12.67 days | Namibia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Namibia or Seychelles?
- Namibia, at 139 days against 126 days in Seychelles as of 2012.
- What is the difference in time required to deal with construction permits between Namibia and Seychelles?
- 13 days, with Namibia ahead.
- How many years of comparable data are there for Namibia and Seychelles?
- 8 years are reported by both, from 2005 to 2012.
- How do Namibia and Seychelles rank globally for time required to deal with construction permits?
- Namibia ranks 34th and Seychelles ranks 37th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.