Niger vs Sub-Saharan Africa (excluding high income): Time required to deal with construction permits
Niger
326 days
in 2012
Sub-Saharan Africa (excluding high income)
196.75 days
in 2012
Niger rank
6th
Sub-Saharan Africa (excluding high income) rank
3rd
Time required to deal with construction permits over time
- Niger
- Sub-Saharan Africa (excluding high income)
How they compare
Niger currently reports 326 days against 196.75 days in Sub-Saharan Africa (excluding high income), a difference of 129.25 days.
That makes Niger's figure about 1.7 times Sub-Saharan Africa (excluding high income)'s.
Across all 8 years both countries report, Niger has been ahead every year.
Niger ranks 6th and Sub-Saharan Africa (excluding high income) ranks 3rd of 50 countries.
Niger has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Niger | Sub-Saharan Africa (excluding high income) | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 327.8 days | 225.04 days | 102.76 days | Niger |
| 2010s | 326 days | 199.74 days | 126.26 days | Niger |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Niger or Sub-Saharan Africa (excluding high income)?
- Niger, at 326 days against 196.75 days in Sub-Saharan Africa (excluding high income) as of 2012.
- What is the difference in time required to deal with construction permits between Niger and Sub-Saharan Africa (excluding high income)?
- 129.25 days, with Niger ahead.
- How many years of comparable data are there for Niger and Sub-Saharan Africa (excluding high income)?
- 8 years are reported by both, from 2005 to 2012.
- How do Niger and Sub-Saharan Africa (excluding high income) rank globally for time required to deal with construction permits?
- Niger ranks 6th and Sub-Saharan Africa (excluding high income) ranks 3rd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.