Time required to deal with construction permits in Sub-Saharan Africa (excluding high income)

Sub-Saharan Africa (excluding high income): Time required to deal with construction permits was 196.75 days in 2012. ▼ Falling

Latest (2012)
196.75 days
Change on year
down 1.2%
Rank
3rd
of 6 groups
All-time high
229.16 days
in 2006
All-time low
196.75 days
in 2012
Years of data
8
2005–2012

Time required to deal with construction permits in Sub-Saharan Africa (excluding high income), 2005–2012

0501001502002502005200820122005: 225.1 days2006: 229.2 days2007: 228 days2008: 226.9 days2009: 216 days2010: 203.4 days2011: 199 days2012: 196.8 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Sub-Saharan Africa (excluding high income) recorded 196.75 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

The figure is down 1.2% on the previous year and down 12.6% over ten years.

Time required to deal with construction permits in Sub-Saharan Africa (excluding high income), year by year

Annual values for Time required to deal with construction permits (days) in Sub-Saharan Africa (excluding high income), 2005 to 2012.
Year days Change
2005 225.12 days
2006 229.16 days +1.8%
2007 228.02 days -0.5%
2008 226.86 days -0.5%
2009 216.04 days -4.8%
2010 203.43 days -5.8%
2011 199.04 days -2.2%
2012 196.75 days -1.2%

Averages by decade

DecadeAverage LowestHighest Years
2000s 225.04 days 216.04 days 229.16 days 5
2010s 199.74 days 196.75 days 203.43 days 3

Countries ranked near Sub-Saharan Africa (excluding high income)

  1. 1 Zimbabwe 614 days compare
  2. 2 Côte d'Ivoire 475 days compare
  3. 3 Mozambique 377 days compare
  4. 4 Angola 348 days compare
  5. 5 Lesotho 330 days compare
  6. 6 Niger 326 days compare

See the full ranking of 56 places →

More private sector data for Sub-Saharan Africa (excluding high income)

All data for Sub-Saharan Africa (excluding high income) →

Frequently asked questions

What is time required to deal with construction permits in Sub-Saharan Africa (excluding high income)?
Time required to deal with construction permits in Sub-Saharan Africa (excluding high income) was 196.75 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Sub-Saharan Africa (excluding high income)?
The highest recorded value was 229.16 days in 2006.
What is the lowest time required to deal with construction permits recorded in Sub-Saharan Africa (excluding high income)?
The lowest recorded value was 196.75 days in 2012.
How does Sub-Saharan Africa (excluding high income) rank for time required to deal with construction permits?
Sub-Saharan Africa (excluding high income) ranks 3rd out of 6 groups with data for 2012.
Is time required to deal with construction permits rising or falling in Sub-Saharan Africa (excluding high income)?
Over the last ten years it is down 12.6%. The long-run trend across the full record is falling.
Where does this Sub-Saharan Africa (excluding high income) data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Sub-Saharan Africa (excluding high income). Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 04 September 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/sub-saharan-africa-excluding-high-income/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/sub-saharan-africa-excluding-high-income/">Time required to deal with construction permits in Sub-Saharan Africa (excluding high income)</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.