Niger vs Sub-Saharan Africa: Time required to deal with construction permits

Niger
326 days
in 2012
Sub-Saharan Africa
196.07 days
in 2012
Niger rank
6th
Sub-Saharan Africa rank
4th

Time required to deal with construction permits over time

  • Niger
  • Sub-Saharan Africa
0100200300200520082012

How they compare

Niger currently reports 326 days against 196.07 days in Sub-Saharan Africa, a difference of 129.93 days.

That makes Niger's figure about 1.7 times Sub-Saharan Africa's.

Across all 8 years both countries report, Niger has been ahead every year.

Niger ranks 6th and Sub-Saharan Africa ranks 4th of 50 countries.

Niger has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Niger Sub-Saharan Africa Difference Ahead
2000s 327.8 days 223.72 days 104.08 days Niger
2010s 326 days 198.99 days 127.01 days Niger

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Niger or Sub-Saharan Africa?
Niger, at 326 days against 196.07 days in Sub-Saharan Africa as of 2012.
What is the difference in time required to deal with construction permits between Niger and Sub-Saharan Africa?
129.93 days, with Niger ahead.
How many years of comparable data are there for Niger and Sub-Saharan Africa?
8 years are reported by both, from 2005 to 2012.
How do Niger and Sub-Saharan Africa rank globally for time required to deal with construction permits?
Niger ranks 6th and Sub-Saharan Africa ranks 4th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Niger vs Sub-Saharan Africa: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 28 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/niger/sub-saharan-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/niger/sub-saharan-africa/">Niger vs Sub-Saharan Africa: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.