Time required to deal with construction permits in Sub-Saharan Africa
Sub-Saharan Africa: Time required to deal with construction permits was 196.07 days in 2012. ▼ Falling
Time required to deal with construction permits in Sub-Saharan Africa, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
Sub-Saharan Africa recorded 196.07 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.
That represents a change of down 1.1% on the previous year and down 12.4% over ten years.
Time required to deal with construction permits in Sub-Saharan Africa, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 223.77 days | — |
| 2006 | 227.76 days | +1.8% |
| 2007 | 226.64 days | -0.5% |
| 2008 | 225.51 days | -0.5% |
| 2009 | 214.93 days | -4.7% |
| 2010 | 202.6 days | -5.7% |
| 2011 | 198.31 days | -2.1% |
| 2012 | 196.07 days | -1.1% |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 223.72 days | 214.93 days | 227.76 days | 5 |
| 2010s | 198.99 days | 196.07 days | 202.6 days | 3 |
Countries ranked near Sub-Saharan Africa
More private sector data for Sub-Saharan Africa
- Merchandise trade 44.5% (2025)
- Food imports 12.1% (2024)
- Manufactures imports 56.8% (2024)
- Merchandise imports 501.15 billion current US$ (2025)
- Food exports 14.7% (2024)
- Manufactures exports 19.4% (2024)
- Merchandise exports 486.80 billion current US$ (2025)
- Merchandise exports (current US$), per capita 368.33 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.2201 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 11.24 % change on previous year (2025)
Frequently asked questions
- What is time required to deal with construction permits in Sub-Saharan Africa?
- Time required to deal with construction permits in Sub-Saharan Africa was 196.07 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Sub-Saharan Africa?
- The highest recorded value was 227.76 days in 2006.
- What is the lowest time required to deal with construction permits recorded in Sub-Saharan Africa?
- The lowest recorded value was 196.07 days in 2012.
- How does Sub-Saharan Africa rank for time required to deal with construction permits?
- Sub-Saharan Africa ranks 4th out of 6 groups with data for 2012.
- Is time required to deal with construction permits rising or falling in Sub-Saharan Africa?
- Over the last ten years it is down 12.4%. The long-run trend across the full record is falling.
- Where does this Sub-Saharan Africa data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.