Niger vs Togo: Time required to deal with construction permits

Niger
326 days
in 2012
Togo
309 days
in 2012
Niger rank
6th
Togo rank
7th

Time required to deal with construction permits over time

  • Niger
  • Togo
0100200300200520082012

How they compare

Niger currently reports 326 days against 309 days in Togo, a difference of 17 days.

That makes Niger's figure about 1.1 times Togo's.

Across all 8 years both countries report, Niger has been ahead every year.

Niger ranks 6th and Togo ranks 7th of 50 countries.

Niger has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Niger Togo Difference Ahead
2000s 327.8 days 309 days 18.8 days Niger
2010s 326 days 309 days 17 days Niger

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Niger or Togo?
Niger, at 326 days against 309 days in Togo as of 2012.
What is the difference in time required to deal with construction permits between Niger and Togo?
17 days, with Niger ahead.
How many years of comparable data are there for Niger and Togo?
8 years are reported by both, from 2005 to 2012.
How do Niger and Togo rank globally for time required to deal with construction permits?
Niger ranks 6th and Togo ranks 7th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Niger vs Togo: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/niger/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/niger/togo/">Niger vs Togo: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.