Nigeria vs Tunisia: Time required to deal with construction permits

Nigeria
85 days
in 2012
Tunisia
88 days
in 2012
Nigeria rank
48th
Tunisia rank
47th

Time required to deal with construction permits over time

  • Nigeria
  • Tunisia
100150200250300200520082012

How they compare

Tunisia currently reports 88 days against 85 days in Nigeria, a difference of 3 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Nigeria ahead.

Nigeria ranks 48th and Tunisia ranks 47th of 50 countries.

Across the 2 decades both report, Nigeria averaged higher in 1 and Tunisia in 1.

Head to head by decade

Decade Nigeria Tunisia Difference Ahead
2000s 271.8 days 86.4 days 185.4 days Nigeria
2010s 85 days 88 days 3 days Tunisia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Nigeria or Tunisia?
Tunisia, at 88 days against 85 days in Nigeria as of 2012.
What is the difference in time required to deal with construction permits between Nigeria and Tunisia?
3 days, with Tunisia ahead.
How many years of comparable data are there for Nigeria and Tunisia?
8 years are reported by both, from 2005 to 2012.
How do Nigeria and Tunisia rank globally for time required to deal with construction permits?
Nigeria ranks 48th and Tunisia ranks 47th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Nigeria vs Tunisia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/nigeria/tunisia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/nigeria/tunisia/">Nigeria vs Tunisia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.