Senegal vs Sierra Leone: Time required to deal with construction permits

Senegal
210 days
in 2012
Sierra Leone
238 days
in 2012
Senegal rank
15th
Sierra Leone rank
12th

Time required to deal with construction permits over time

  • Senegal
  • Sierra Leone
0100200300200520082012

How they compare

Sierra Leone currently reports 238 days against 210 days in Senegal, a difference of 28 days.

That makes Sierra Leone's figure about 1.1 times Senegal's.

Across all 8 years both countries report, Sierra Leone has been ahead every year.

Senegal ranks 15th and Sierra Leone ranks 12th of 50 countries.

Sierra Leone has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Senegal Sierra Leone Difference Ahead
2000s 220 days 248.6 days 28.6 days Sierra Leone
2010s 210 days 238 days 28 days Sierra Leone

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Senegal or Sierra Leone?
Sierra Leone, at 238 days against 210 days in Senegal as of 2012.
What is the difference in time required to deal with construction permits between Senegal and Sierra Leone?
28 days, with Sierra Leone ahead.
How many years of comparable data are there for Senegal and Sierra Leone?
8 years are reported by both, from 2005 to 2012.
How do Senegal and Sierra Leone rank globally for time required to deal with construction permits?
Senegal ranks 15th and Sierra Leone ranks 12th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Senegal vs Sierra Leone: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/senegal/sierra-leone/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/senegal/sierra-leone/">Senegal vs Sierra Leone: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.