Sierra Leone vs Sudan: Time required to deal with construction permits
Sierra Leone
238 days
in 2012
Sudan
270 days
in 2012
Sierra Leone rank
12th
Sudan rank
10th
Time required to deal with construction permits over time
- Sierra Leone
- Sudan
How they compare
Sudan currently reports 270 days against 238 days in Sierra Leone, a difference of 32 days.
That makes Sudan's figure about 1.1 times Sierra Leone's.
Across all 8 years both countries report, Sudan has been ahead every year.
Sierra Leone ranks 12th and Sudan ranks 10th of 50 countries.
Sudan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Sierra Leone | Sudan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 248.6 days | 270 days | 21.4 days | Sudan |
| 2010s | 238 days | 270 days | 32 days | Sudan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Sierra Leone or Sudan?
- Sudan, at 270 days against 238 days in Sierra Leone as of 2012.
- What is the difference in time required to deal with construction permits between Sierra Leone and Sudan?
- 32 days, with Sudan ahead.
- How many years of comparable data are there for Sierra Leone and Sudan?
- 8 years are reported by both, from 2005 to 2012.
- How do Sierra Leone and Sudan rank globally for time required to deal with construction permits?
- Sierra Leone ranks 12th and Sudan ranks 10th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.