Sierra Leone vs Sudan: Time required to deal with construction permits

Sierra Leone
238 days
in 2012
Sudan
270 days
in 2012
Sierra Leone rank
12th
Sudan rank
10th

Time required to deal with construction permits over time

  • Sierra Leone
  • Sudan
0100200300200520082012

How they compare

Sudan currently reports 270 days against 238 days in Sierra Leone, a difference of 32 days.

That makes Sudan's figure about 1.1 times Sierra Leone's.

Across all 8 years both countries report, Sudan has been ahead every year.

Sierra Leone ranks 12th and Sudan ranks 10th of 50 countries.

Sudan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sierra Leone Sudan Difference Ahead
2000s 248.6 days 270 days 21.4 days Sudan
2010s 238 days 270 days 32 days Sudan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Sierra Leone or Sudan?
Sudan, at 270 days against 238 days in Sierra Leone as of 2012.
What is the difference in time required to deal with construction permits between Sierra Leone and Sudan?
32 days, with Sudan ahead.
How many years of comparable data are there for Sierra Leone and Sudan?
8 years are reported by both, from 2005 to 2012.
How do Sierra Leone and Sudan rank globally for time required to deal with construction permits?
Sierra Leone ranks 12th and Sudan ranks 10th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sierra Leone vs Sudan: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sierra-leone/sudan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sierra-leone/sudan/">Sierra Leone vs Sudan: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.