Sub-Saharan Africa vs Togo: Time required to deal with construction permits
Sub-Saharan Africa
196.07 days
in 2012
Togo
309 days
in 2012
Sub-Saharan Africa rank
4th
Togo rank
7th
Time required to deal with construction permits over time
- Sub-Saharan Africa
- Togo
How they compare
Togo currently reports 309 days against 196.07 days in Sub-Saharan Africa, a difference of 112.93 days.
That makes Togo's figure about 1.6 times Sub-Saharan Africa's.
Across all 8 years both countries report, Togo has been ahead every year.
Sub-Saharan Africa ranks 4th and Togo ranks 7th of 6 groups.
Togo has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Sub-Saharan Africa | Togo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 223.72 days | 309 days | 85.28 days | Togo |
| 2010s | 198.99 days | 309 days | 110.01 days | Togo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Sub-Saharan Africa or Togo?
- Togo, at 309 days against 196.07 days in Sub-Saharan Africa as of 2012.
- What is the difference in time required to deal with construction permits between Sub-Saharan Africa and Togo?
- 112.93 days, with Togo ahead.
- How many years of comparable data are there for Sub-Saharan Africa and Togo?
- 8 years are reported by both, from 2005 to 2012.
- How do Sub-Saharan Africa and Togo rank globally for time required to deal with construction permits?
- Sub-Saharan Africa ranks 4th and Togo ranks 7th of 6 groups.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.