Sub-Saharan Africa vs Togo: Time required to deal with construction permits

Sub-Saharan Africa
196.07 days
in 2012
Togo
309 days
in 2012
Sub-Saharan Africa rank
4th
Togo rank
7th

Time required to deal with construction permits over time

  • Sub-Saharan Africa
  • Togo
0100200300200520082012

How they compare

Togo currently reports 309 days against 196.07 days in Sub-Saharan Africa, a difference of 112.93 days.

That makes Togo's figure about 1.6 times Sub-Saharan Africa's.

Across all 8 years both countries report, Togo has been ahead every year.

Sub-Saharan Africa ranks 4th and Togo ranks 7th of 6 groups.

Togo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sub-Saharan Africa Togo Difference Ahead
2000s 223.72 days 309 days 85.28 days Togo
2010s 198.99 days 309 days 110.01 days Togo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Sub-Saharan Africa or Togo?
Togo, at 309 days against 196.07 days in Sub-Saharan Africa as of 2012.
What is the difference in time required to deal with construction permits between Sub-Saharan Africa and Togo?
112.93 days, with Togo ahead.
How many years of comparable data are there for Sub-Saharan Africa and Togo?
8 years are reported by both, from 2005 to 2012.
How do Sub-Saharan Africa and Togo rank globally for time required to deal with construction permits?
Sub-Saharan Africa ranks 4th and Togo ranks 7th of 6 groups.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sub-Saharan Africa vs Togo: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sub-saharan-africa/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/sub-saharan-africa/togo/">Sub-Saharan Africa vs Togo: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.