Dealing with construction permits, cost in Burkina Faso

Burkina Faso: Dealing with construction permits, cost was 380.7% in 2012. ▼ Falling

Latest (2012)
380.7%
Change on year
down 5.2%
World rank
25th
of 50 countries
All-time high
982.7%
in 2005
All-time low
380.7%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Burkina Faso, 2005–2012

02004006008001.0k2005200820122005: 982.7 % of income per capita2006: 977.8 % of income per capita2007: 844.6 % of income per capita2008: 785.9 % of income per capita2009: 733.4 % of income per capita2010: 588 % of income per capita2011: 401.6 % of income per capita2012: 380.7 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

In 2012, dealing with construction permits, cost in Burkina Faso stood at 380.7%. That is the lowest value across all 8 years on record.

That represents a change of down 5.2% on the previous year and down 61.3% over ten years.

Burkina Faso ranks 25th of 50 countries on this measure, in the middle of the range.

Dealing with construction permits, cost in Burkina Faso, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Burkina Faso, 2005 to 2012.
Year % of income per capita Change
2005 982.7%
2006 977.8% -0.5%
2007 844.6% -13.6%
2008 785.9% -7.0%
2009 733.4% -6.7%
2010 588.0% -19.8%
2011 401.6% -31.7%
2012 380.7% -5.2%

Averages by decade

DecadeAverage LowestHighest Years
2000s 864.9% 733.4% 982.7% 5
2010s 456.8% 380.7% 588.0% 3

Countries ranked near Burkina Faso

  1. 22 Mali 418.6% compare
  2. 23 Nigeria 417.7% compare
  3. 24 Sao Tome and Principe 386.7% compare
  4. 26 Rwanda 278.4% compare
  5. 27 Ethiopia 275.6% compare
  6. 28 Sierra Leone 265.9% compare

See the full ranking of 56 places →

More private sector data for Burkina Faso

All data for Burkina Faso →

Frequently asked questions

What is dealing with construction permits, cost in Burkina Faso?
Dealing with construction permits, cost in Burkina Faso was 380.7% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Burkina Faso?
The highest recorded value was 982.7% in 2005.
What is the lowest dealing with construction permits, cost recorded in Burkina Faso?
The lowest recorded value was 380.7% in 2012.
How does Burkina Faso rank for dealing with construction permits, cost?
Burkina Faso ranks 25th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Burkina Faso?
Over the last ten years it is down 61.3%. The long-run trend across the full record is falling.
Where does this Burkina Faso data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Burkina Faso. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 10 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/burkina-faso/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/burkina-faso/">Dealing with construction permits, cost in Burkina Faso</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.