Dealing with construction permits, cost in Sierra Leone

Sierra Leone: Dealing with construction permits, cost was 265.9% in 2012. ▼ Falling

Latest (2012)
265.9%
Change on year
down 2.5%
World rank
28th
of 50 countries
All-time high
716.8%
in 2005
All-time low
265.9%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Sierra Leone, 2005–2012

02004006008002005200820122005: 716.8 % of income per capita2006: 582 % of income per capita2007: 553.3 % of income per capita2008: 428.3 % of income per capita2009: 349 % of income per capita2010: 325.2 % of income per capita2011: 272.6 % of income per capita2012: 265.9 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Sierra Leone recorded 265.9% for dealing with construction permits, cost in 2012. That is the lowest value across all 8 years on record.

The figure is down 2.5% on the previous year and down 62.9% over ten years.

That places Sierra Leone 28th out of 50 countries with data for 2012, putting it in the middle of the range.

Dealing with construction permits, cost in Sierra Leone, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Sierra Leone, 2005 to 2012.
Year % of income per capita Change
2005 716.8%
2006 582.0% -18.8%
2007 553.3% -4.9%
2008 428.3% -22.6%
2009 349.0% -18.5%
2010 325.2% -6.8%
2011 272.6% -16.2%
2012 265.9% -2.5%

Averages by decade

DecadeAverage LowestHighest Years
2000s 525.9% 349.0% 716.8% 5
2010s 287.9% 265.9% 325.2% 3

Countries ranked near Sierra Leone

  1. 25 Burkina Faso 380.7% compare
  2. 26 Rwanda 278.4% compare
  3. 27 Ethiopia 275.6% compare
  4. 29 Tunisia 256.0% compare
  5. 30 Sudan 240.3% compare
  6. 31 Morocco 220.2% compare

See the full ranking of 56 places →

More private sector data for Sierra Leone

All data for Sierra Leone →

Frequently asked questions

What is dealing with construction permits, cost in Sierra Leone?
Dealing with construction permits, cost in Sierra Leone was 265.9% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Sierra Leone?
The highest recorded value was 716.8% in 2005.
What is the lowest dealing with construction permits, cost recorded in Sierra Leone?
The lowest recorded value was 265.9% in 2012.
How does Sierra Leone rank for dealing with construction permits, cost?
Sierra Leone ranks 28th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Sierra Leone?
Over the last ten years it is down 62.9%. The long-run trend across the full record is falling.
Where does this Sierra Leone data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Sierra Leone. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 03 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/sierra-leone/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/sierra-leone/">Dealing with construction permits, cost in Sierra Leone</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.