Dealing with construction permits, cost in Burundi

Burundi: Dealing with construction permits, cost was 1,911.9% in 2012. ▼ Falling

Latest (2012)
1,911.9%
Change on year
down 39.0%
World rank
5th
of 50 countries
All-time high
13,205.2%
in 2005
All-time low
1,911.9%
in 2012
Years of data
8
2005–2012

Dealing with construction permits, cost in Burundi, 2005–2012

2.5k5.0k7.5k10.0k12.5k2005200820122005: 13.2k % of income per capita2006: 10.8k % of income per capita2007: 12.2k % of income per capita2008: 10.5k % of income per capita2009: 7.4k % of income per capita2010: 6.3k % of income per capita2011: 3.1k % of income per capita2012: 1.9k % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Burundi recorded 1,911.9% for dealing with construction permits, cost in 2012. That is the lowest value across all 8 years on record.

The figure is down 39.0% on the previous year and down 85.5% over ten years.

That places Burundi 5th out of 50 countries with data for 2012, putting it in the top 10%.

Dealing with construction permits, cost in Burundi, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Burundi, 2005 to 2012.
Year % of income per capita Change
2005 13,205.2%
2006 10,829.4% -18.0%
2007 12,219.7% +12.8%
2008 10,470.0% -14.3%
2009 7,380.4% -29.5%
2010 6,295.5% -14.7%
2011 3,135.7% -50.2%
2012 1,911.9% -39.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 10,820.9% 7,380.4% 13,205.2% 5
2010s 3,781.0% 1,911.9% 6,295.5% 3

Countries ranked near Burundi

  1. 2 Zimbabwe 4,423.4% compare
  2. 3 Mauritania 2,796.6% compare
  3. 4 Djibouti 2,023.6% compare
  4. 6 Zambia 1,679.1% compare
  5. 7 Niger 1,612.8% compare
  6. 8 Congo, Democratic Republic of the 1,582.7% compare

See the full ranking of 56 places →

More private sector data for Burundi

All data for Burundi →

Frequently asked questions

What is dealing with construction permits, cost in Burundi?
Dealing with construction permits, cost in Burundi was 1,911.9% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Burundi?
The highest recorded value was 13,205.2% in 2005.
What is the lowest dealing with construction permits, cost recorded in Burundi?
The lowest recorded value was 1,911.9% in 2012.
How does Burundi rank for dealing with construction permits, cost?
Burundi ranks 5th out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Burundi?
Over the last ten years it is down 85.5%. The long-run trend across the full record is falling.
Where does this Burundi data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Burundi. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 03 September 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/burundi/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/burundi/">Dealing with construction permits, cost in Burundi</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.