Dealing with construction permits, cost in Namibia

Namibia: Dealing with construction permits, cost was 110.9% in 2012. ▼ Falling

Latest (2012)
110.9%
Change on year
up 7.7%
World rank
42nd
of 50 countries
All-time high
188.3%
in 2007
All-time low
103.0%
in 2011
Years of data
8
2005–2012

Dealing with construction permits, cost in Namibia, 2005–2012

0501001502002005200820122005: 177.1 % of income per capita2006: 170.4 % of income per capita2007: 188.3 % of income per capita2008: 181.8 % of income per capita2009: 171.1 % of income per capita2010: 113 % of income per capita2011: 103 % of income per capita2012: 110.9 % of income per capita

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in % of income per capita.

Analysis

Namibia recorded 110.9% for dealing with construction permits, cost in 2012.

Compared with earlier readings it is up 7.7% on the previous year and down 37.4% over ten years.

Namibia ranks 42nd of 50 countries on this measure, in the bottom quarter.

Dealing with construction permits, cost in Namibia, year by year

Annual values for Dealing with construction permits, cost (% of income per capita) in Namibia, 2005 to 2012.
Year % of income per capita Change
2005 177.1%
2006 170.4% -3.8%
2007 188.3% +10.5%
2008 181.8% -3.5%
2009 171.1% -5.9%
2010 113.0% -34.0%
2011 103.0% -8.8%
2012 110.9% +7.7%

Averages by decade

DecadeAverage LowestHighest Years
2000s 177.7% 170.4% 188.3% 5
2010s 109.0% 103.0% 113.0% 3

Countries ranked near Namibia

  1. 39 Gambia 124.7% compare
  2. 40 Equatorial Guinea 120.4% compare
  3. 41 Mozambique 113.3% compare
  4. 43 Eswatini 94.9% compare
  5. 44 Guinea 94.8% compare
  6. 45 Gabon 79.3% compare

See the full ranking of 56 places →

More private sector data for Namibia

All data for Namibia →

Frequently asked questions

What is dealing with construction permits, cost in Namibia?
Dealing with construction permits, cost in Namibia was 110.9% in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest dealing with construction permits, cost recorded in Namibia?
The highest recorded value was 188.3% in 2007.
What is the lowest dealing with construction permits, cost recorded in Namibia?
The lowest recorded value was 103.0% in 2011.
How does Namibia rank for dealing with construction permits, cost?
Namibia ranks 42nd out of 50 countries with data for 2012.
Is dealing with construction permits, cost rising or falling in Namibia?
Over the last ten years it is down 37.4%. The long-run trend across the full record is falling.
Where does this Namibia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Dealing with construction permits, cost (% of income per capita). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits, cost in Namibia. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 28 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/namibia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-income-per-capita/namibia/">Dealing with construction permits, cost in Namibia</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.