Dealing with construction permits: Cost in Montenegro

Montenegro: Dealing with construction permits: Cost was 4.9% in 2019. ◆ Volatile

Latest (2019)
4.9%
Change on year
down 19.7%
World rank
55th
of 187 countries
All-time high
35.4%
in 2006
All-time low
4.9%
in 2019
Years of data
14
2006–2019

Dealing with construction permits: Cost in Montenegro, 2006–2019

0102030402006201220192006: 35.4 % of Warehouse value2007: 30 % of Warehouse value2008: 21.3 % of Warehouse value2009: 24.5 % of Warehouse value2010: 29 % of Warehouse value2011: 28.5 % of Warehouse value2012: 23.2 % of Warehouse value2013: 23.2 % of Warehouse value2014: 12.2 % of Warehouse value2015: 11.9 % of Warehouse value2016: 11.3 % of Warehouse value2017: 5.6 % of Warehouse value2018: 6.1 % of Warehouse value2019: 4.9 % of Warehouse value

Source: World Bank. Measured in % of Warehouse value.

Analysis

The most recent figure for dealing with construction permits: cost in Montenegro is 4.9%, measured in 2019. That is the lowest value across all 14 years on record.

That represents a change of down 19.7% on the previous year and down 80.0% over ten years.

Over the whole period, dealing with construction permits: cost in Montenegro peaked at 35.4% in 2006 and was at its lowest, 4.9%, in 2019.

Montenegro ranks 55th of 187 countries on this measure, in the middle of the range.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Cost in Montenegro, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) in Montenegro, 2006 to 2019.
Year % of Warehouse value Change
2006 35.4%
2007 30.0% -15.3%
2008 21.3% -29.0%
2009 24.5% +15.0%
2010 29.0% +18.4%
2011 28.5% -1.7%
2012 23.2% -18.6%
2013 23.2% +0.0%
2014 12.2% -47.4%
2015 11.9% -2.5%
2016 11.3% -5.0%
2017 5.6% -50.4%
2018 6.1% +8.9%
2019 4.9% -19.7%

Averages by decade

DecadeAverage LowestHighest Years
2000s 27.8% 21.3% 35.4% 4
2010s 15.6% 4.9% 29.0% 10

Countries ranked near Montenegro

  1. 52 Kuwait 5.5% compare
  2. 53 Tanzania, United Republic of 5.4% compare
  3. 54 Kosovo 5.2% compare
  4. 56 Benin 4.8% compare
  5. 56 Djibouti 4.8% compare
  6. 56 Mauritania 4.8% compare

See the full ranking of 187 places →

More private sector data for Montenegro

All data for Montenegro →

Frequently asked questions

What is dealing with construction permits: cost in Montenegro?
Dealing with construction permits: cost in Montenegro was 4.9% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost recorded in Montenegro?
The highest recorded value was 35.4% in 2006.
What is the lowest dealing with construction permits: cost recorded in Montenegro?
The lowest recorded value was 4.9% in 2019.
How does Montenegro rank for dealing with construction permits: cost?
Montenegro ranks 55th out of 187 countries with data for 2019.
Is dealing with construction permits: cost rising or falling in Montenegro?
Over the last ten years it is down 80.0%. The long-run trend across the full record is volatile.
Where does this Montenegro data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost in Montenegro. Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/montenegro/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value/montenegro/">Dealing with construction permits: Cost in Montenegro</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.