Dealing with construction permits (DB06-15 methodology) - Score in Australia

Australia: Dealing with construction permits (DB06-15 methodology) - Score was 83.71 in 2014. ▬ Flat

Latest (2014)
83.71
Change on year
down 0.0%
World rank
10th
of 181 countries
All-time high
83.72
in 2013
All-time low
80.75
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in Australia, 2005–2014

0204060802005200920142005: 80.72006: 80.82007: 80.82008: 80.82009: 83.72010: 83.72011: 83.72012: 83.72013: 83.72014: 83.7

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db06-15 methodology) - score in Australia is 83.71, measured in 2014.

That represents a change of up 3.7% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in Australia peaked at 83.72 in 2013 and was at its lowest, 80.75, in 2005.

Australia ranks 10th of 181 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 81.38 80.75 83.69 5
2010s 83.71 83.69 83.72 5

Countries ranked near Australia

  1. 7 Taiwan 86.14 compare
  2. 8 South Korea 85.98 compare
  3. 9 Estonia 85.51 compare
  4. 11 Maldives 83.45 compare
  5. 12 Sweden 83.3 compare
  6. 13 Norway 83.15 compare

See the full ranking of 183 places →

More private sector data for Australia

All data for Australia →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in Australia?
Dealing with construction permits (db06-15 methodology) - score in Australia was 83.71 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in Australia?
The highest recorded value was 83.72 in 2013.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in Australia?
The lowest recorded value was 80.75 in 2005.
How does Australia rank for dealing with construction permits (db06-15 methodology) - score?
Australia ranks 10th out of 181 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in Australia?
Over the last ten years it is up 3.7%. The long-run trend across the full record is flat.
Where does this Australia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.