Dealing with construction permits (DB06-15 methodology) - Score in Taiwan
Taiwan: Dealing with construction permits (DB06-15 methodology) - Score was 86.14 in 2014. ▲ Rising
Dealing with construction permits (DB06-15 methodology) - Score in Taiwan, 2005–2014
Source: World Bank.
Analysis
The most recent figure for dealing with construction permits (db06-15 methodology) - score in Taiwan is 86.14, measured in 2014. That is the highest value across all 10 years on record.
That represents a change of up 31.1% over ten years.
Over the whole period, dealing with construction permits (db06-15 methodology) - score in Taiwan peaked at 86.14 in 2014 and was at its lowest, 65.02, in 2007.
That places Taiwan 7th out of 181 countries with data for 2014, putting it in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 65.64 | 65.02 | 65.88 | 5 |
| 2010s | 78.3 | 65.86 | 86.14 | 5 |
Countries ranked near Taiwan
- 4 Georgia 87.6 compare
- 5 United Kingdom 86.82 compare
- 6 United Arab Emirates 86.38 compare
- 8 Korea, Rep. 85.98 compare
- 9 Estonia 85.51 compare
- 10 Australia 83.71 compare
More private sector data for Taiwan
- Starting a business: Paid-in Minimum capital (% of income per capita) 100.0% (2019)
- Starting a business: Minimum capital 0.0% (2019)
- Starting a business: Cost - Women (% of income per capita) - Score 99.1% (2019)
- Starting a business: Cost - Men (% of income per capita) - Score 99.1% (2019)
- Starting a business: Time - Women 10 days (2019)
- Starting a business: Time - Women (days)- Score 90.45 (2019)
- Starting a business: Time - Men 10 days (2019)
- Starting a business: Time - Men (days) - Score 90.45 (2019)
- Starting a business: Procedures required - Women 3 number (2019)
- Starting a business: Procedures required - Women (number) - Score 88.24 (2019)
Frequently asked questions
- What is dealing with construction permits (db06-15 methodology) - score in Taiwan?
- Dealing with construction permits (db06-15 methodology) - score in Taiwan was 86.14 in 2014, according to the World Bank.
- What is the highest dealing with construction permits (db06-15 methodology) - score recorded in Taiwan?
- The highest recorded value was 86.14 in 2014.
- What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in Taiwan?
- The lowest recorded value was 65.02 in 2007.
- How does Taiwan rank for dealing with construction permits (db06-15 methodology) - score?
- Taiwan ranks 7th out of 181 countries with data for 2014.
- Is dealing with construction permits (db06-15 methodology) - score rising or falling in Taiwan?
- Over the last ten years it is up 31.1%. The long-run trend across the full record is rising.
- Where does this Taiwan data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.