Dealing with construction permits (DB06-15 methodology) - Score in United Arab Emirates

United Arab Emirates: Dealing with construction permits (DB06-15 methodology) - Score was 86.38 in 2014. ▲ Rising

Latest (2014)
86.38
Change on year
up 0.0%
World rank
6th
of 184 countries
All-time high
86.38
in 2014
All-time low
73.67
in 2005
Years of data
10
2005–2014

Dealing with construction permits (DB06-15 methodology) - Score in United Arab Emirates, 2005–2014

0204060802005200920142005: 73.72006: 73.72007: 73.72008: 73.72009: 82.42010: 82.32011: 83.62012: 85.12013: 86.42014: 86.4

Source: World Bank.

Analysis

United Arab Emirates recorded 86.38 for dealing with construction permits (db06-15 methodology) - score in 2014. That is the highest value across all 10 years on record.

Compared with earlier readings it is up 17.3% over ten years.

Over the whole period, dealing with construction permits (db06-15 methodology) - score in United Arab Emirates peaked at 86.38 in 2014 and was at its lowest, 73.67, in 2005.

That places United Arab Emirates 6th out of 184 countries with data for 2014, putting it in the top 10%.

Dealing with construction permits (DB06-15 methodology) - Score in United Arab Emirates, year by year

Annual values for Dealing with construction permits (DB06-15 methodology) - Score in United Arab Emirates, 2005 to 2014.
Year Value Change
2005 73.67 —
2006 73.69 +0.0%
2007 73.7 +0.0%
2008 73.7 +0.0%
2009 82.35 +11.7%
2010 82.31 -0.1%
2011 83.65 +1.6%
2012 85.11 +1.8%
2013 86.37 +1.5%
2014 86.38 +0.0%

United Arab Emirates compared with similar countries

  • United Arab Emirates's 86.38 is above the median for high income countries, which is 71.77, 1.2× the median. (59 countries reporting)
  • United Arab Emirates's 86.38 is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 63.03, 1.4× the median. (21 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 75.42 73.67 82.35 5
2010s 84.76 82.31 86.38 5

Countries ranked near United Arab Emirates

  1. 3 Hong Kong 88.29 compare
  2. 4 Georgia 87.6 compare
  3. 5 United Kingdom 86.82 compare
  4. 7 Taiwan 86.14 compare
  5. 8 South Korea 85.98 compare
  6. 9 Estonia 85.51 compare

See the full ranking of 184 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is dealing with construction permits (db06-15 methodology) - score in United Arab Emirates?
Dealing with construction permits (db06-15 methodology) - score in United Arab Emirates was 86.38 in 2014, according to the World Bank.
What is the highest dealing with construction permits (db06-15 methodology) - score recorded in United Arab Emirates?
The highest recorded value was 86.38 in 2014.
What is the lowest dealing with construction permits (db06-15 methodology) - score recorded in United Arab Emirates?
The lowest recorded value was 73.67 in 2005.
How does United Arab Emirates rank for dealing with construction permits (db06-15 methodology) - score?
United Arab Emirates ranks 6th out of 184 countries with data for 2014.
Is dealing with construction permits (db06-15 methodology) - score rising or falling in United Arab Emirates?
Over the last ten years it is up 17.3%. The long-run trend across the full record is rising.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB06-15 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB06-15 methodology) - Score in United Arab Emirates. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db06-15-methodology-score/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db06-15-methodology-score/united-arab-emirates/">Dealing with construction permits (DB06-15 methodology) - Score in United Arab Emirates</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,819 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.