Dealing with construction permits (DB16-20 methodology) - Score in Cambodia

Cambodia: Dealing with construction permits (DB16-20 methodology) - Score was 44.55 in 2019. ▲ Rising

Latest (2019)
44.55
Change on year
up 0.7%
World rank
179th
of 191 countries
All-time high
44.55
in 2019
All-time low
39.99
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Cambodia, 2014–2019

0102030402014201620192014: 402015: 40.82016: 41.32017: 41.92018: 44.22019: 44.6

Source: World Bank.

Analysis

Cambodia recorded 44.55 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the highest value across all 6 years on record.

That represents a change of up 0.7% on the previous year and up 11.4% over ten years.

Cambodia ranks 179th of 191 countries on this measure, in the bottom quarter.

Dealing with construction permits (DB16-20 methodology) - Score in Cambodia, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Cambodia, 2014 to 2019.
Year Value Change
2014 39.99 —
2015 40.77 +1.9%
2016 41.28 +1.3%
2017 41.86 +1.4%
2018 44.23 +5.7%
2019 44.55 +0.7%

Cambodia compared with similar countries

  • Cambodia's 44.55 is below the median for lower middle income countries, which is 64.54, 69% of the median. (47 countries reporting)
  • Cambodia's 44.55 is below the median for East Asia & Pacific, which is 71.5, 62% of the median. (28 countries reporting)

Countries ranked near Cambodia

  1. 176 Venezuela 46.45 compare
  2. 177 Nicaragua 46.33 compare
  3. 178 Guinea-Bissau 45.24 compare
  4. 180 Haiti 44.22 compare
  5. 181 Niger 44.15 compare
  6. 182 Sierra Leone 38.43 compare

See the full ranking of 191 places →

More private sector data for Cambodia

All data for Cambodia →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Cambodia?
Dealing with construction permits (db16-20 methodology) - score in Cambodia was 44.55 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Cambodia?
The highest recorded value was 44.55 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Cambodia?
The lowest recorded value was 39.99 in 2014.
How does Cambodia rank for dealing with construction permits (db16-20 methodology) - score?
Cambodia ranks 179th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Cambodia?
Over the last ten years it is up 11.4%. The long-run trend across the full record is rising.
Where does this Cambodia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Cambodia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/cambodia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/cambodia/">Dealing with construction permits (DB16-20 methodology) - Score in Cambodia</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.