Dealing with construction permits (DB16-20 methodology) - Score in Congo
Congo: Dealing with construction permits (DB16-20 methodology) - Score was 61.28 in 2019. ▬ Flat
Dealing with construction permits (DB16-20 methodology) - Score in Congo, 2014–2019
Source: World Bank.
Analysis
In 2019, dealing with construction permits (db16-20 methodology) - score in Congo stood at 61.28.
That represents a change of up 2.4% on the previous year and down 1.7% over ten years.
Congo ranks 133rd of 188 countries on this measure, in the middle of the range.
Countries ranked near Congo
- 130 Senegal 62.06 compare
- 131 Uzbekistan 61.68 compare
- 132 Mali 61.43 compare
- 134 Bangladesh 61.05 compare
- 135 Micronesia (country) 61.03 compare
- 136 Tajikistan 60.85 compare
More private sector data for Congo
- Merchandise trade 94.4% (2025)
- Food imports 21.2% (2023)
- Manufactures imports 71.4% (2023)
- Merchandise imports 7.90 billion current US$ (2025)
- Food exports 0.2% (2023)
- Manufactures exports 10.3% (2023)
- Merchandise exports 7.50 billion current US$ (2025)
- Commercial service exports 225.02 million current US$ (2021)
- Transport services 33.8% (2021)
- Computer, communications and other services 61.4% (2021)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in Congo?
- Dealing with construction permits (db16-20 methodology) - score in Congo was 61.28 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Congo?
- The highest recorded value was 62.36 in 2015.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Congo?
- The lowest recorded value was 59.6 in 2017.
- How does Congo rank for dealing with construction permits (db16-20 methodology) - score?
- Congo ranks 133rd out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in Congo?
- Over the last ten years it is down 1.7%. The long-run trend across the full record is flat.
- Where does this Congo data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.