Dealing with construction permits (DB16-20 methodology) - Score in Dominica
Dominica: Dealing with construction permits (DB16-20 methodology) - Score was 70.08 in 2019. ▬ Flat
Dealing with construction permits (DB16-20 methodology) - Score in Dominica, 2014–2019
Source: World Bank.
Analysis
Dominica recorded 70.08 for dealing with construction permits (db16-20 methodology) - score in 2019.
That represents a change of up 0.0% over ten years.
Dominica ranks 83rd of 188 countries on this measure, in the middle of the range.
Countries ranked near Dominica
More private sector data for Dominica
- Merchandise trade 39.1% (2025)
- Food imports 25.2% (2023)
- Manufactures imports 53.5% (2023)
- Merchandise imports 259.00 million current US$ (2025)
- Food exports 41.2% (2023)
- Manufactures exports 57.8% (2023)
- Merchandise exports 24.00 million current US$ (2025)
- Commercial service exports 177.62 million current US$ (2025)
- Transport services 19.2% (2025)
- Computer, communications and other services 57.4% (2025)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in Dominica?
- Dealing with construction permits (db16-20 methodology) - score in Dominica was 70.08 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Dominica?
- The highest recorded value was 70.09 in 2018.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Dominica?
- The lowest recorded value was 70.07 in 2016.
- How does Dominica rank for dealing with construction permits (db16-20 methodology) - score?
- Dominica ranks 83rd out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in Dominica?
- Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
- Where does this Dominica data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.