Dealing with construction permits (DB16-20 methodology) - Score in Dominican Republic

Dominican Republic: Dealing with construction permits (DB16-20 methodology) - Score was 70.75 in 2019. ▼ Falling

Latest (2019)
70.75
Change on year
up 0.5%
World rank
80th
of 191 countries
All-time high
75.01
in 2015
All-time low
70.14
in 2017
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Dominican Republic, 2014–2019

0204060802014201620192014: 74.82015: 752016: 71.52017: 70.12018: 70.42019: 70.7

Source: World Bank.

Analysis

Dominican Republic recorded 70.75 for dealing with construction permits (db16-20 methodology) - score in 2019.

The figure is up 0.5% on the previous year and down 5.5% over ten years.

That places Dominican Republic 80th out of 191 countries with data for 2019, putting it in the middle of the range.

Dealing with construction permits (DB16-20 methodology) - Score in Dominican Republic, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Dominican Republic, 2014 to 2019.
Year Value Change
2014 74.83 —
2015 75.01 +0.2%
2016 71.46 -4.7%
2017 70.14 -1.8%
2018 70.42 +0.4%
2019 70.75 +0.5%

Dominican Republic compared with similar countries

  • Dominican Republic's 70.75 is below the median for upper middle income countries, which is 70.92, 100% of the median. (56 countries reporting)
  • Dominican Republic's 70.75 is above the median for Latin America & Caribbean, which is 65.74, 1.1× the median. (33 countries reporting)

Countries ranked near Dominican Republic

  1. 77 Bahamas 70.9 compare
  2. 78 Costa Rica 70.8 compare
  3. 79 Spain 70.8 compare
  4. 81 Rwanda 70.64 compare
  5. 82 Benin 70.54 compare
  6. 83 Dominica 70.08 compare

See the full ranking of 191 places →

More private sector data for Dominican Republic

All data for Dominican Republic →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Dominican Republic?
Dealing with construction permits (db16-20 methodology) - score in Dominican Republic was 70.75 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Dominican Republic?
The highest recorded value was 75.01 in 2015.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Dominican Republic?
The lowest recorded value was 70.14 in 2017.
How does Dominican Republic rank for dealing with construction permits (db16-20 methodology) - score?
Dominican Republic ranks 80th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Dominican Republic?
Over the last ten years it is down 5.5%. The long-run trend across the full record is falling.
Where does this Dominican Republic data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Dominican Republic. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/dominican-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/dominican-republic/">Dealing with construction permits (DB16-20 methodology) - Score in Dominican Republic</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.