Dealing with construction permits (DB16-20 methodology) - Score in Liberia

Liberia: Dealing with construction permits (DB16-20 methodology) - Score was 28.94 in 2019. ▬ Flat

Latest (2019)
28.94
Change on year
unchanged
World rank
183rd
of 188 countries
All-time high
28.94
in 2014
All-time low
28.94
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Liberia, 2014–2019

01020302014201620192014: 28.92015: 28.92016: 28.92017: 28.92018: 28.92019: 28.9

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Liberia stood at 28.94. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

Liberia ranks 183rd of 188 countries on this measure, in the bottom quarter.

Countries ranked near Liberia

  1. 180 Madagascar 35.9 compare
  2. 181 Afghanistan 34.54 compare
  3. 182 Central African Republic 34.1 compare
  4. 184 Eritrea 0 compare
  5. 184 Libya 0 compare
  6. 184 Somalia, Fed. Rep. 0 compare
  7. 184 Syrian Arab Republic 0 compare
  8. 184 Yemen, Rep. 0 compare

See the full ranking of 190 places →

More private sector data for Liberia

All data for Liberia →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Liberia?
Dealing with construction permits (db16-20 methodology) - score in Liberia was 28.94 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Liberia?
The highest recorded value was 28.94 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Liberia?
The lowest recorded value was 28.94 in 2014.
How does Liberia rank for dealing with construction permits (db16-20 methodology) - score?
Liberia ranks 183rd out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Liberia?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Liberia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.