Dealing with construction permits (DB16-20 methodology) - Score in Yemen, Rep.
Yemen, Rep.: Dealing with construction permits (DB16-20 methodology) - Score was 0 in 2019. ◆ Volatile
Dealing with construction permits (DB16-20 methodology) - Score in Yemen, Rep., 2014–2019
Source: World Bank.
Analysis
Yemen, Rep. recorded 0 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the lowest value across all 6 years on record.
Compared with earlier readings it is down 100.0% over ten years.
Yemen, Rep. ranks 184th of 188 countries on this measure, in the bottom quarter.
Countries ranked near Yemen, Rep.
- 181 Afghanistan 34.54 compare
- 182 Central African Republic 34.1 compare
- 183 Liberia 28.94 compare
- 184 Eritrea 0 compare
- 184 Libya 0 compare
- 184 Somalia, Fed. Rep. 0 compare
- 184 Syrian Arab Republic 0 compare
More private sector data for Yemen, Rep.
- Merchandise trade 24.7% (2025)
- Food imports 39.1% (2019)
- Manufactures imports 31.4% (2019)
- Merchandise imports 4.65 billion current US$ (2025)
- Food exports 99.3% (2019)
- Manufactures exports 0.6% (2019)
- Merchandise exports 196.00 million current US$ (2025)
- Commercial service exports 308.66 million current US$ (2016)
- Transport services 54.3% (2016)
- Computer, communications and other services 29.9% (2016)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in Yemen, Rep.?
- Dealing with construction permits (db16-20 methodology) - score in Yemen, Rep. was 0 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Yemen, Rep.?
- The highest recorded value was 69.05 in 2014.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Yemen, Rep.?
- The lowest recorded value was 0 in 2016.
- How does Yemen, Rep. rank for dealing with construction permits (db16-20 methodology) - score?
- Yemen, Rep. ranks 184th out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in Yemen, Rep.?
- Over the last ten years it is down 100.0%. The long-run trend across the full record is volatile.
- Where does this Yemen, Rep. data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.