Dealing with construction permits (DB16-20 methodology) - Score in Tonga

Tonga: Dealing with construction permits (DB16-20 methodology) - Score was 71.91 in 2019. ▼ Falling

Latest (2019)
71.91
Change on year
down 3.5%
World rank
69th
of 191 countries
All-time high
76.67
in 2014
All-time low
71.91
in 2019
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Tonga, 2014–2019

0204060802014201620192014: 76.72015: 76.52016: 74.32017: 73.92018: 74.62019: 71.9

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Tonga is 71.91, measured in 2019. That is the lowest value across all 6 years on record.

The figure is down 3.5% on the previous year and down 6.2% over ten years.

Tonga ranks 69th of 191 countries on this measure, in the middle of the range.

Dealing with construction permits (DB16-20 methodology) - Score in Tonga, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Tonga, 2014 to 2019.
Year Value Change
2014 76.67 —
2015 76.49 -0.2%
2016 74.28 -2.9%
2017 73.91 -0.5%
2018 74.56 +0.9%
2019 71.91 -3.5%

Tonga compared with similar countries

  • Tonga's 71.91 is above the median for upper middle income countries, which is 70.92, 1.0× the median. (56 countries reporting)
  • Tonga's 71.91 is above the median for East Asia & Pacific, which is 71.5, 1.0× the median. (28 countries reporting)

Countries ranked near Tonga

  1. 66 Sri Lanka 72.26 compare
  2. 67 Zambia 72.09 compare
  3. 68 Kuwait 71.94 compare
  4. 70 Jamaica 71.88 compare
  5. 71 Switzerland 71.76 compare
  6. 72 Iceland 71.56 compare

See the full ranking of 191 places →

More private sector data for Tonga

All data for Tonga →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Tonga?
Dealing with construction permits (db16-20 methodology) - score in Tonga was 71.91 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Tonga?
The highest recorded value was 76.67 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Tonga?
The lowest recorded value was 71.91 in 2019.
How does Tonga rank for dealing with construction permits (db16-20 methodology) - score?
Tonga ranks 69th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Tonga?
Over the last ten years it is down 6.2%. The long-run trend across the full record is falling.
Where does this Tonga data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Tonga. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/tonga/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/tonga/">Dealing with construction permits (DB16-20 methodology) - Score in Tonga</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.